Introduction

A regulated river system may be composed of several upstream reservoirs on multiple flow paths, thus providing a number of options to supply the downstream water order. During the ordering phase, water orders are accumulated from downstream to upstream and consider the average travel time, or order time of water (bound by the minimum and maximum travel time). Order time is calculated in the demand phase and is used to determine how many time-steps into the future water orders need to be processed for at each network component.

Orders can be processed in one of two ways:

Take the following into consideration when deciding which type of ordering to configure for your scenario:

Choosing ordering approach

Begin by choosing Edit » Scenario Options and selecting Ordering Algorithm. This opens the Ordering Algorithm section of Scenario Options (Figure 1). Choose New rules based ordering system from the Ordering Approach drop-down menu to configure rules-based ordering. To configure netLP, choose Iterative solution to network linear program, this will make the rest of the display active and allow you to configure options for netLP, refer to Network Linear Programming and the NetLP - SRG for further information.

Figure 1. Enabling ordering

 

Each node must be configured differently depending on the type of ordering approach used. The sub-pages describe how to set up nodes for each approach:

Ordering with ownership

When ownership is enabled in Source, every water order is associated with an owner and is generally supplied using that owner’s water. Where there is insufficient water to supply an owner’s order at any location, and another owner has water surplus to their requirements, the owner with a deficit may borrow water from the owner with surplus to help meet demand (Distribution systems, Borrow and payback systems).

Note: The ordering phase needs to consider the ownership of losses and gains such that when the order reaches a storage, the correct volume of each owners’ water is released. It also needs to consider ownership of maximum and minimum order constraints.

Ordering priorities

If using rules-based ordering, you can set the priority that the system will attempt to meet orders originating from individual nodes. This configuration is still available if the Network Linear Programming method is selected, but will not affect the ordering system. Priorities are set at the scenario level.